Before you sign for the keys, we go through the finished Mambourin house room by room and list everything incomplete, damaged or outside tolerance, so the builder fixes it while the contract still obliges them to.
One of our inspectors will call you back. If it is urgent, call 1300 471 805.
A Mambourin pre-handover inspection is measured against your contract, plans and selections, the Guide to Standards and Tolerances 2015, the NCC, AS 3740 for wet areas and AS 3700 for masonry.
8 checkpoints across 8 areas on a standard Mambourin pre-handover (PCI) inspection. If a room is locked, a roof space is blocked or materials are stacked in the way, the report says so and lists it as not inspected.
Ten items from Mambourin handover reports, each one photographed on the day.










New Construction Stage Inspections Seven visits timed to the moments a Mambourin build is about to be covered up.
Defect Investigation Reports When a crack or damp patch will not go away, we trace it to a cause and set out what the standard says.
Pre-Purchase Building Inspections What the house is really like behind the open-for-inspection, reported under AS 4349.1.
Building and Pest Inspections Building and timber pest in one visit, with the conditions that draw termites photographed.
Rental minimum standards (Victoria) inspections A Mambourin rental checked against all 15 Victorian minimum standards, with a clear result for each. Instant online pricing, or talk to the booking team on 1300 471 805.
Roughly a week before your practical completion date. That leaves time for the report and for the builder to start on the list before you sign.
Anything that needs testing or energising: electrical circuits, gas, pressure testing, appliances and heating or cooling commissioning. We do not open up finished work or inspect areas blocked on the day, and occupancy certification belongs to your building surveyor.
Yes. Slab cracking between 2mm and 4mm and a shower screen that was not properly fixed have both come out of Mambourin handover visits.